River Tuipui, Seiling-Champai road, Mizoram
The project included construction of an 85 m span bridge over River Tuipui in Mizoram. The substructure had already been constructed by the department. The superstructure arrangement consisted of three PSC spans — two 20 m T-Beam spans and one box girder span. The bridge site was located at km 130.24 on the Seiling-Champai road under project Pushpak. The project was completed one month in advance.